Tube003.jpg
A tunnel of nearly 2 km for pedestrians, bicycles and buses, embellished with videos and sound effects, was inaugurated on Thursday night in Lyon.
The almost two-kilometre-long tunnel, which will be the largest structure in Europe dedicated to sustainable transport.
At the entrance, a fresco created by children from the nearby school.
2 mins by bus, 10 minutes by bike, 20-30 minutes walk: it is the time estimated to bring the two rivers who passing under the Croix-Rousse.
Concocted by the artist Skertzò, 12 sequences of 150 meters will punctuate this long tunnel of 1.7 km for "distracting" the people.
Projected like a movie screen outdoor, frescoes unfold to the principle of anamorphosis
Open from 5am to 0:30, it was directed by Vinci Construction
2km, no restroom...
Un tunnel de près de 2 km réservé aux piétons, vélos et bus, agrémenté de vidéos et effets sonores, a été inauguré jeudi soir à Lyon. Une "première mondiale" selon la ville, qui dévoilait l'ouvrage la veille de la traditionnelle fête des Lumières.
A l'entrée, une fresque réalisée par des enfants de l'école voisine.
2 mn en bus, 10 mn en vélo, 20 à 30 mn à pieds : c'est le temps estimé pour rallier les deux fleuves en transitant sous la Croix-Rousse.
Concoctées par l’artiste Skertzò, 12 séquences de 150 mètres vont rythmer ce tunnel long de 1,7 km pour "distraire le regard"
Projetées comme sur un écran de cinéma de plein air, les fresques se déploient selon le principe de l'anamorphose
Ouvert de 5h à 0h30, il a été réalisé par Vinci Construction pour un coût de 282,8 millions d'euros
2km, pas de WC. Au cas ou, faut parcourir le tube en entier
- Copyright
- Bruno Vigneron
- Image Size
- 3000x2002 / 3.6MB
- Keywords
- Contained in galleries
- Tube mode doux, Lyon